ft.com web signal

AI 'picks and shovels' stocks lose $4.2tn since June peak

TL;DR

  • Global manufacturing, utility and mining stocks tied to AI data-centre build-outs have shed $4.2 trillion in market value since June, an FT analysis found.
  • An equal-weighted basket of nine US-listed suppliers including Caterpillar, Vertiv and Oklo fell 39.4% from its 22 June peak to 13 November.
  • Order books stayed full: Caterpillar reported a record $78 billion backlog and Eaton said orders had doubled year-on-year.

Global manufacturing, utility and mining companies tied to the AI build-out have shed $4.2 trillion in market value since June, the Financial Times reports, almost half of the $9.4 trillion the same companies had gained in the previous twelve months. The losses concentrate in the names most often described by media coverage as "picks and shovels" for data-centre construction.

An equal-weighted basket of nine US-listed suppliers (Caterpillar, Vertiv, GE Vernova, Eaton, Comfort Systems USA, Corning, Oklo, Constellation Energy and Bloom Energy) peaked at 191.9 on 22 June and closed at 116.3 on 13 November, a fall of 39.4%. Individual drawdowns run deeper: Oklo down 77.3%, Corning 55.4%, Vertiv 46.3%, Comfort Systems 46.2%, Bloom Energy 44.5%, Caterpillar 43.6% and GE Vernova 31.6%.

The sell-off runs alongside, not into, the physical build. US data-centre construction spending excluding chips and IT equipment reached $96 billion in the twelve months to September, and the hardware orders behind it are still climbing. Caterpillar reported a record $78 billion backlog, and Eaton said orders had doubled year-on-year.

The disconnect is what the credit side has been flagging. Deutsche Bank's Brett Ryan told the FT the equity market was "finally benchmarking to what credit was already telling you" about risky financing for data-centre construction. The AI infrastructure story has been the dominant thread in our coverage, with 482 alerts on our AI infrastructure feed in the last 90 days.